News Logo
Global Unrestricted
Neo 2 Consumer Spraying

Spraying Construction Sites with Neo 2 | Mountain Tips

February 11, 2026
8 min read
Spraying Construction Sites with Neo 2 | Mountain Tips

Spraying Construction Sites with Neo 2 | Mountain Tips

META: Master mountain construction site spraying with the Neo 2 drone. Expert tips on obstacle avoidance, pre-flight prep, and high-altitude operations for safer, faster results.

TL;DR

  • Pre-flight sensor cleaning is critical for reliable obstacle avoidance in dusty mountain construction environments
  • The Neo 2's ActiveTrack and subject tracking capabilities require specific calibration for sloped terrain operations
  • D-Log color profiles capture essential documentation footage even in harsh mountain lighting conditions
  • Proper Hyperlapse programming creates compelling project progress documentation while maintaining spray efficiency

Why Mountain Construction Sites Demand Specialized Drone Spraying Protocols

Dust, debris, and unpredictable wind patterns make mountain construction sites among the most challenging environments for drone spraying operations. The Neo 2 handles these conditions exceptionally well—but only when operators understand the critical pre-flight preparations that keep safety systems functioning at peak performance.

This guide walks you through every step of preparing, operating, and optimizing your Neo 2 for construction site spraying in elevated terrain. You'll learn the exact cleaning protocols that prevent sensor failures, the ActiveTrack configurations that maintain precision on slopes, and the documentation techniques that satisfy site managers and regulatory requirements.


The Pre-Flight Cleaning Protocol That Saves Missions

Before discussing flight operations, we need to address the single most overlooked factor in mountain construction drone failures: contaminated safety sensors.

Understanding Your Neo 2's Sensor Array

The Neo 2 relies on multiple sensor systems for obstacle avoidance:

  • Forward-facing vision sensors detect structures, equipment, and terrain changes
  • Downward optical flow sensors maintain position stability during hovering spray operations
  • Infrared proximity sensors provide close-range obstacle detection in low-visibility conditions

Each sensor requires specific cleaning attention before mountain construction operations.

The 5-Minute Sensor Cleaning Routine

Complete this sequence before every mountain site deployment:

  1. Inspect all sensor lenses with a magnifying glass for micro-scratches or embedded particles
  2. Use compressed air (held 6 inches from sensors) to remove loose dust
  3. Apply lens cleaning solution to microfiber cloth—never directly to sensors
  4. Wipe in circular motions starting from center, moving outward
  5. Verify sensor status in the Neo 2 app before powering up motors

Pro Tip: Mountain construction sites generate silica-heavy dust that bonds to sensor coatings. Carry a dedicated cleaning kit with 99% isopropyl alcohol wipes specifically for post-flight sensor maintenance. This prevents cumulative buildup that degrades obstacle avoidance accuracy over multiple flights.


Configuring Obstacle Avoidance for Sloped Terrain

Standard obstacle avoidance settings assume relatively flat operating environments. Mountain construction sites break these assumptions entirely.

Terrain-Adaptive Settings

Adjust these parameters before launching:

  • Set obstacle detection sensitivity to High for environments with scattered equipment
  • Enable APAS 4.0 advanced pilot assistance for automatic path adjustment
  • Configure minimum altitude buffer to 15 feet above highest site structures
  • Activate terrain following mode for consistent spray height on slopes

Dealing with False Positives

Dust clouds and airborne debris trigger false obstacle readings. The Neo 2's obstacle avoidance system interprets dense particle concentrations as solid objects, causing unnecessary flight path deviations.

Solution approach:

  • Schedule spray operations during low-wind windows (typically early morning)
  • Coordinate with ground crews to pause dust-generating activities during critical spray passes
  • Use manual override judiciously when you've visually confirmed clear airspace

Subject Tracking and ActiveTrack for Construction Applications

While subject tracking features like ActiveTrack seem designed for following moving subjects, they serve valuable purposes in construction spraying operations.

Tracking Equipment and Personnel for Safety

Configure ActiveTrack to monitor:

  • Ground crew positions to maintain safe separation distances
  • Moving equipment like excavators or dump trucks
  • Spray coverage boundaries using placed markers

The Neo 2's subject tracking algorithms maintain awareness of up to 10 simultaneous subjects, providing real-time alerts when spray paths intersect with tracked objects.

QuickShots for Progress Documentation

Between spray operations, capture site documentation using QuickShots modes:

QuickShots Mode Best Construction Use Duration
Dronie Overall site overview 15 seconds
Rocket Vertical structure progress 12 seconds
Circle Equipment positioning 20 seconds
Helix Comprehensive site spiral 25 seconds
Boomerang Before/after comparisons 18 seconds

These automated capture sequences require minimal pilot attention while producing professional documentation footage.


Hyperlapse Programming for Long-Term Project Tracking

Construction projects benefit enormously from time-lapse documentation. The Neo 2's Hyperlapse feature creates compelling progress videos while you focus on primary spray operations.

Setting Up Automated Hyperlapse Capture

Program Hyperlapse sequences during scheduled spray mission breaks:

  1. Mark waypoints at consistent positions you'll return to throughout the project
  2. Set capture intervals between 2-5 seconds depending on activity level
  3. Configure flight paths that showcase spray coverage progression
  4. Enable D-Log color profile for maximum post-processing flexibility

Expert Insight: The most valuable construction Hyperlapse footage comes from identical camera positions captured across multiple site visits. Create a saved mission profile specifically for documentation flights, ensuring frame-perfect consistency that makes time-lapse sequences seamless.


D-Log Configuration for Mountain Lighting Challenges

Mountain construction sites present extreme lighting contrasts—deep shadows from equipment and structures alongside harsh direct sunlight on exposed terrain.

Why D-Log Matters for Construction Documentation

D-Log captures a wider dynamic range than standard color profiles, preserving detail in both shadows and highlights. This proves essential when:

  • Documenting spray coverage in shaded areas
  • Capturing equipment condition for maintenance records
  • Creating regulatory compliance footage
  • Producing client-facing progress reports

Optimal D-Log Settings for Construction

Parameter Recommended Setting Rationale
Color Profile D-Log M Maximum dynamic range
ISO 100-400 Minimize noise in shadows
Shutter Speed 1/120 minimum Reduce motion blur
White Balance 5600K fixed Consistent color across clips
Exposure Compensation -0.7 EV Protect highlight detail

Spray Pattern Optimization for Sloped Terrain

Mountain construction sites rarely offer flat surfaces. Effective spray coverage requires understanding how slope angles affect distribution patterns.

Calculating Slope Compensation

For every 10 degrees of slope, adjust your:

  • Flight altitude by 8% to maintain consistent nozzle-to-surface distance
  • Spray rate by 12% to account for gravity-assisted runoff
  • Pass overlap by 15% to prevent coverage gaps on downhill edges

Wind Considerations at Elevation

Higher altitudes mean thinner air and different wind behavior:

  • Thermal updrafts peak between 10 AM and 3 PM—avoid precision spraying during these hours
  • Katabatic winds (downslope cold air drainage) occur in early morning and evening
  • Mechanical turbulence forms around structures and terrain features

Common Mistakes to Avoid

Skipping sensor calibration after transport: Vehicle vibration during mountain road travel can shift sensor alignment. Run calibration checks after arriving at remote sites.

Ignoring battery temperature warnings: Cold mountain mornings reduce battery performance by up to 30%. Pre-warm batteries to 20°C minimum before flight.

Overrelying on obstacle avoidance in dust conditions: Particulate matter confuses sensors. Maintain visual line of sight and manual control readiness at all times.

Using automatic exposure for documentation: Shifting lighting causes inconsistent footage. Lock exposure settings manually for professional results.

Neglecting propeller inspection: Construction debris causes invisible micro-damage. Inspect propellers with 10x magnification before each flight day.


Frequently Asked Questions

How often should I clean Neo 2 sensors during active construction site operations?

Clean sensors before every flight when operating in dusty mountain construction environments. Additionally, perform quick visual inspections after each battery swap. Silica particles from construction activities bond aggressively to optical coatings, and even minor contamination degrades obstacle avoidance reliability. Carry a dedicated cleaning kit with microfiber cloths, compressed air, and lens cleaning solution as standard equipment.

Can the Neo 2's ActiveTrack follow moving construction equipment reliably?

ActiveTrack performs well with construction equipment when properly configured. Set tracking sensitivity to High and ensure the equipment has distinct visual contrast against the terrain. The system tracks objects moving up to 28 mph, which covers most construction vehicle speeds. However, dust clouds from moving equipment can temporarily break tracking locks—maintain manual control readiness during these operations.

What's the maximum effective slope angle for automated spray missions?

The Neo 2 handles automated spray missions on slopes up to 35 degrees when terrain following mode is properly configured. Beyond this angle, manual control provides better results due to the complex interaction between gravity, wind, and spray distribution. For steeper terrain, break the area into smaller sections and approach from multiple angles to ensure complete coverage.


Bringing It All Together

Mountain construction site spraying with the Neo 2 demands respect for the environment and attention to preparation details. The pre-flight sensor cleaning routine alone prevents the majority of mission failures operators experience in these challenging conditions.

Master the obstacle avoidance configurations, understand how ActiveTrack serves safety purposes beyond creative applications, and leverage D-Log for documentation that satisfies every stakeholder. The techniques covered here transform the Neo 2 from a capable drone into an indispensable construction site tool.

Ready for your own Neo 2? Contact our team for expert consultation.

Back to News
Share this article: